Home / Blog / Solar modules

Solar modules

Solar modules: the lot, the line, and the module that shipped

Solar modules on a production line

A module lot combines cells, glass, and a line result. Yield loss and a rework are often a shift note. The lot that shipped should already say which material lots and which modules.

A downgraded module is not the same cost as a prime module.

What the open lot has to show

That is the same kind of gap as seeing the work while it is still open and quoting from a current cost.

The week the record is late

The shift downgrades a stack. The customer order is still planned as all prime. The downgrade is found when the pallets are staged.

Class the modules before the order promises them. MFGMAX Heavy Metals holds that record. Accounting can stay where it is. Other systems can connect. What moves, and when, is shown before you commit.

Mark the week on Problems and Solutions, or read how integrations stay with the platform instead of replacing it.

Questions

What should stay on the open lot?

Cell and material lots on the module lot. Prime, downgrade, and scrap counted before the lot closes. The shipment tied to those module identities.

When should the lot be compared with the quote?

While it is still open. A count after invoicing explains a loss. It does not give the material or the hours back.

What does MFGMAX connect this to?

Class the modules before the order promises them.

Bring one open lot

The quote, and what the floor actually used. One walkthrough. The systems you already run can stay connected.

Mark this problem