Precast: the pour, the steel, and the job
A precast job is a pour, the steel in it, the crew, and the pieces that were rejected. The bid froze a yardage and a crew. The pour used a different yardage, and the reject is still in the form.
A reject that is not on the job is a cost with no price.
What the open job has to show
- Concrete and steel issued to the piece.
- Crew hours on that pour.
- Accepted pieces and rejects before the job is billed.
That is the same kind of gap as seeing the work while it is still open and quoting from a current cost.
The week the record is late
The field adds embeds. The crew puts them in. The price is the original piece. The extra steel is on a purchase that never found the job.
MFGMAX Construction keeps the bid, the change, and the cost on the open job. MFGMAX Construction holds that record. Accounting can stay where it is. Other systems can connect. What moves, and when, is shown before you commit. MFGMAX keeps the job, the inventory, the price, and the balance on one record. Your accountant still closes the books. This is the history of what changed, not an audit opinion.
Mark the week on Problems and Solutions, or read how integrations stay with the platform instead of replacing it.
Questions
What should stay on the open job?
Concrete and steel issued to the piece. Crew hours on that pour. Accepted pieces and rejects before the job is billed.
When should the job be compared with the quote?
While it is still open. A count after invoicing explains a loss. It does not give the material or the hours back.
What does MFGMAX connect this to?
MFGMAX Construction keeps the bid, the change, and the cost on the open job. MFGMAX keeps the job, the inventory, the price, and the balance on one record. Your accountant still closes the books. This is the history of what changed, not an audit opinion.