Home / Blog / Glass

Glass

Glass containers: the batch, the pack, and the loss

Hot glass containers on a forming line

A glass batch is a furnace pull and a pack count that are rarely the same number. Loss, a color change, and a mold swap sit between them.

The cost people remember is the pull. The cost that shipped is the pack.

What the open batch has to show

That is the same kind of gap as seeing the work while it is still open and quoting from a current cost.

The week the record is late

A color change consumes more than the standard. The next orders are still planned on the old loss. Cullet and rejected ware are counted at the end of the week as one tub.

Split the loss onto the batch that made it. MFGMAX Beverage and Food holds that record. Accounting can stay where it is. Other systems can connect. What moves, and when, is shown before you commit.

Mark the week on Problems and Solutions, or read how integrations stay with the platform instead of replacing it.

Questions

What should stay on the open batch?

The batch and the lots of material charged. Packs made and loss before the batch is treated as finished. A job or color change kept on the batches it actually touched.

When should the batch be compared with the quote?

While it is still open. A count after invoicing explains a loss. It does not give the material or the hours back.

What does MFGMAX connect this to?

Split the loss onto the batch that made it.

Bring one open batch

The quote, and what the floor actually used. One walkthrough. The systems you already run can stay connected.

Mark this problem