Home / Blog / Automotive components

Automotive components

Automotive components: the lot, the scrap, and the job

Machined automotive components in trays

A component job has a lot, a scrap rate, and hours. The price was accepted on a PPM and a cycle time. The job ran a different scrap rate, and the cert packet is built after the truck is scheduled.

The packet should be the record the job already has.

What the open job has to show

That is the same kind of gap as seeing the work while it is still open and quoting from a current cost.

The week the record is late

Scrap is over the quote for the third week. The planner still releases the next release on the quoted rate. Purchasing buys to that release. The floor already knows the rate is wrong.

Let this job correct the next release. MFGMAX Heavy Metals holds that record. Accounting can stay where it is. Other systems can connect. What moves, and when, is shown before you commit. This does not replace a required material test, a weld procedure, or an environmental permit.

Mark the week on Problems and Solutions, or read how integrations stay with the platform instead of replacing it.

Questions

What should stay on the open job?

Material lot on the job. Good pieces and scrap before shipment. Hours against the cycle the quote sold.

When should the job be compared with the quote?

While it is still open. A count after invoicing explains a loss. It does not give the material or the hours back.

What does MFGMAX connect this to?

Let this job correct the next release. This does not replace a required material test, a weld procedure, or an environmental permit.

Bring one open job

The quote, and what the floor actually used. One walkthrough. The systems you already run can stay connected.

Mark this problem